Tuesday, May 18, 2010

This floor...

This floor has been a real pain in the ass. Two weeks and still not done. The smell of the polyurethane is overwhelming. I don't blame the floor guy, since he got a bad batch of minwax. It would not dry in the normal time. It took over 20 hours to dry. Max time should be 12 hours. This material he used now is fast drying but very strong. I just want to get it over and done with. I can't wait to have my furniture back where it belongs.

Still not done yet, once this is done he is going to install flooring upstairs, however, this time the flooring will be prefinished and ready to walk on immediately after installation. It is all worth it though since the house will look great and it should be easier to keep clean. We shall see...

No comments:

Post a Comment